History.

Between 1928–1974, the Kemayoran Airfield intended for domestic flights was considered too close to an Indonesian military airfield, Halim Perdanakusuma. The civil airspace in the area became narrow, while air traffic increased rapidly, which risked international air traffic. In 1969, a Senior Communication Officers meeting in Bangkok expressed this concern.

In the early 1970s, with the help of USAID, eight potential locations were analyzed for a new international airport, namely Kemayoran, Malaka, Babakan, Jonggol, Halim, Curug, South Tangerang and North Tangerang. Finally, the North Tangerang airspace was chosen and it was also noted that Jonggol could be used as an alternative airfield. Meanwhile the Indonesian government started to upgrade the Halim Perdanakusumah airfield to be used for domestic flights.

Between 1974–1975, a Canadian consultant consortium consisting of Aviation Planning Services Ltd., ACRESS International Ltd., and Searle Wilbee Rowland (SWR), won a bid for the new airport feasibility project. The feasibility study started on 20 February 1974 with a total cost of 1 million Canadian Dollars. The one-year project proceed with an Indonesian partner represented by PT Konavi. By the end of March 1975, the study revealed a plan to build three inline runways, a perforated road, three international terminal buildings, three domestic buildings and one building for Hajj flights. Three stores for the domestic terminals would be built between 1975–1981 with a cost of US$ 465 million and one domestic terminal including an apron from 1982–1985 with a cost of US$ 126 million. A new terminal project, named the Jakarta International Airport Cengkareng (code: JIA-C), began.

No comments:

Post a Comment